PI System installation for Gas Turbine monitoring – North Bangkok

Installation and configuration activities of a new PI System in Thailand for EGAT, on behalf of Ansaldo Energia. This new installation allows the data acquisition in order to monitor the Gas Turbines.

IDEX 2019 – Abu Dhabi

e-matica presented with Fincantieri the evolution of the ShipView system with real-time data integration and interactive support to the maintenance through OSIsoft platform

Euronaval 2018 – Paris

e-matica and Fincantieri presented the new evolution of the ShipView system with real-time data integration and interactive support to the maintenance through OSIsoft platform

OSIsoft EMEA UC 2018 – Barcelona

e-matica joined the conference with an experiential booth

We  presented with Ansaldo Energia the Global Remote Monitoring System project

We took part as speakers at the Life Sciences round table